|
Date
|
| |
03/06/2026
|
|
Builder\Owner
|
| |
Highland(Fernando)
|
|
Phone
|
| |
(832) 798-8922
|
|
Address
|
| |
110 Pinehill Trail United States Map It
|
|
Sub division
|
| |
Woodland Hills
|
|
Email
|
| |
Brandon@hoelscherdoors.com
|
|
Inspected By
|
| |
Brandon Nichols
|
|
Installed By
|
| |
Art
|
|
Install Date
|
| |
02/03/2025
|
|
Directon Door Faces
|
| |
SE
|
|
Overhang Height
|
| |
137”
|
|
Depth
|
| |
68”
|
|
Copy on Email
|
| |
- Derek Hoelscher
- Mark Hoelscher
- Roger Drum
- Sarah Schultz
- Sean Renshaw
- Sheldon Martinez
- Kyle Hoelscher
|
|
Notes
|
| |
2880 KA DD 3/4 lite
Flemish IG
South Hampton iron
Ebony satin
Site inspection called in for cracks.
*The stationary door has multiple cracks across the bottom panel (9”-12”).
*Doors clean and seem maintained.
*Moisture eater is good- 6.7%
AAP-Due to the cracks exceeding tolerance we will replace both doors under warranty. RMA. Have installer bring new bolts for T. Bring back defective doors to shop for credit. Bring grills back to shop so we can respray and reuse at a different address.
|
|
File
|
| |
|