Date
|
| |
03/05/2026
|
|
Builder\Owner
|
| |
Highland Homes. Ed
|
|
Phone
|
| |
(281) 932-7573
|
|
Address
|
| |
11206 Common Hackberry St United States Map It
|
|
Sub division
|
| |
Bridgeland
|
|
Email
|
| |
rbolten@hoelscherdoors.com
|
|
Inspected By
|
| |
Roger Bolten
|
|
Installed By
|
| |
Geo
|
|
Install Date
|
| |
02/26/2026
|
|
Copy on Email
|
| |
|
|
Notes
|
| |
QC on Phase 1 unit install
F/D. Construction door hits the jamb in the middle. The 1×4 & B/M has a big gap at bottom.
B/D. 1×4 & B/M has a gap at bottom. See Pics
AAP. Have installer go back to re-block strike side leg and fix 1×4 gaps. Also cut the nails flush with 1×4
|
|